Elba R410A Anleitung zur Fehlerbehebung Seite 33

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 144
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 32
Ceiling suspended
- 37 -
Copyright ©2007 LG Electronics. Inc. All right reserved.
Only for training and service purposes
LGE Internal Use Only
CASE 2
POSITION OF CONSOLE BOLT
Install the unit leaning to a drainage hole side as a fig-
ure for easy water drainage.
A place where the unit will be leveled and that can
support the weight of the unit.
A place where the unit can withstand its vibration.
A place where service can be easily performed.
Select and mark the position for fixing bolts.
Drill the hole for set anchor on the face of ceiling.
Insert the set anchor and washer onto the suspension
bolts for locking the suspension bolts on the ceiling.
Mount the suspension bolts to the set anchor firmly.
Secure the installation plates onto the suspension
bolts (adjust level roughly) using nuts, washers and
spring washers.
Suspension
bolts
Spring
washer
Max.
12mm
Washer
Nut
1 Set anchor
Old building New building
2 Plate washer
3 Spring washer
4 Nut
5 Suspension
bolts
: Tighten the nut and bolt to prevent unit falling
Seitenansicht 32
1 2 ... 28 29 30 31 32 33 34 35 36 37 38 ... 143 144

Kommentare zu diesen Handbüchern

Keine Kommentare